Classification | Dry Type | Wet Type | Comments | |||
---|---|---|---|---|---|---|
Cost of training management | Security deposit | Cost of training management | Security deposit | |||
Type A | 36.68 pyeong | 733,600 | 4,401,600 | 806,960 | 4,841,760 |
|
35.34 pyeong | 706,800 | 4,240,800 | 777,480 | 4,664,880 | ||
Type B | 70.69 pyeong | 1,413,800 | 8,482,800 | 1,555,180 | 9,331,080 |
Dry type - 20,000 won a month/pyeong, Wet type - 22,000 won a month/pyeong
Electricity, water and gas charges are included in the rent.
The deposit is six months' worth of rent.(The deposit is refunded excluding unpaid rent)
1F
5F
1F
5F
5F
5F
Classification | Contents | Comments | |
---|---|---|---|
Height | 6th floor | 4.2m | 1st basement level - 6th floor |
1st - 5th floor | 4.2m (ceiling height 2.8m) | ||
1st basement level | 4.5m (ceiling height 2.8m) | ||
Design load | 6th floor | 15.2 kg/m2(Fan room) | Residency not available for companies installing mechanical equipment that exceeds design standard(load) of the building |
1st - 5th floor | 15.7 kg/m2(Office of development) | ||
1st basement level | Basement level is the basic-section | ||
Standard of noise and vibration | In accordance with the rules of [noise-vibration regulation ] Article 7 and enforcement regulation article 8 | Residency not available for companies installing mechanical equipment that is in violation of the [noise-vibration regulation] | |
External finish | THK24 Low-E multi-layer glass, THK30 Granite finish | ||
Interior finish | Floor | THK2 roll sheet | Office of development |
Wall | Eco-friendly water-based paint | Office of development | |
Ceiling | THK15 nonflammable sound absorbing ceiling material | Office of development | |
Building structure | Steel-frame reinforced concrete | ||
Electric power supply | Power receiving | 900kw | |
Generator capacity | 300kw |
Height(Height per floor): The effective width may vary in accordance with facility, electricity, piping and others during construction